Bosch Rexroth R105506000

SHAFT SUPPORT BLOCK WBS-60

MPN
R105506000
Price and lead time confirmed within 1 business day
Request a Quote
  1. 1We check stock, condition and lead time
  2. 2You get a written quote by email
  3. 3Approve it and we ship — in-stock parts within 1 business day

A real person replies, typically within 1 business day — see our privacy policy.

  • 12-month warranty (new) · 3-month (used/refurbished)
  • 30-day returns, no restocking fee on unused parts
  • 100% positive eBay feedback
  • Ships via

Have spare Bosch Rexroth parts? We buy surplus →

What is the Bosch Rexroth R105506000?

Shaft support block (steel)

Shaft diameter d = 60

Material: Spheroidal graphite cast iron and steel

Side clamping

For easy installing and quick aligning

Precise design with reference edge

More affordable than in-house designs

Specifications

Specifications

Accessories for linear bushingsShaft support blocks
Shaft diameter d [mm]60.0
TypeShaft support block
Housing materialSpheroidal graphite cast iron and steel
Weight [kg]3.31
Dimension A (profiled rail systems) [mm]160
Dimension A1 (profiled rail systems) [mm]100
Dimension B (profiled rail systems) [mm]48
Dimension d H8 [mm]60
Dimension E [mm]132
Dimension H [mm]75.0
Dimension H1 (profiled rail systems) [mm]124
Dimension S [mm]13.5
Dimension SW [mm]8
Dimension V [mm]15
Footnote Dimension H1Tolerance ISO 8062-3 - DCTG 11.

R105506000: frequently asked questions

When can R105506000 be shipped?

R105506000 is sourced on request — request a quote and we'll confirm the exact availability and shipping timeline for this specific unit.

Can I pick up R105506000 in person?

Local pickup from our Groningen, Netherlands warehouse may be possible — contact us before ordering to check availability and arrange a collection time.

Is express delivery available?

Yes — mention it when you request a quote for R105506000 and we'll include express shipping options in our reply.

My factory is down and I need this urgently — can you help?

For a critical breakdown, contact us directly at +31 (0)50-7110348 or sales@partnerplc.com — we can look into same-day courier or dedicated taxi/hotshot delivery for R105506000, subject to availability and destination.

More Bosch Rexroth parts

Bosch Rexroth R105502500 – SHAFT SUPPORT BLOCK WBS-25
Bosch Rexroth
R105502500

SHAFT SUPPORT BLOCK WBS-25

Bosch Rexroth R105503000 – SHAFT SUPPORT BLOCK WBS-30
Bosch Rexroth
R105503000

SHAFT SUPPORT BLOCK WBS-30

Bosch Rexroth R105504000 – SHAFT SUPPORT BLOCK WBS-40
Bosch Rexroth
R105504000

SHAFT SUPPORT BLOCK WBS-40

Bosch Rexroth R105505000 – SHAFT SUPPORT BLOCK WBS-50
Bosch Rexroth
R105505000

SHAFT SUPPORT BLOCK WBS-50

Bosch Rexroth R105508000 – SHAFT SUPPORT BLOCK WBS-80
Bosch Rexroth
R105508000

SHAFT SUPPORT BLOCK WBS-80

Bosch Rexroth R105601200 – SHAFT SUPPORT BLOCK WBG-12F
Bosch Rexroth
R105601200

SHAFT SUPPORT BLOCK WBG-12F

Bosch Rexroth R105601600 – SHAFT SUPPORT BLOCK WBG-16F
Bosch Rexroth
R105601600

SHAFT SUPPORT BLOCK WBG-16F

Bosch Rexroth R105602000 – SHAFT SUPPORT BLOCK WBG-20F
Bosch Rexroth
R105602000

SHAFT SUPPORT BLOCK WBG-20F

Bosch Rexroth R105506000Price and lead time confirmed within 1 business day
Request a Quote