Bosch Rexroth R105502500
SHAFT SUPPORT BLOCK WBS-25
- MPN
- R105502500
- Category
- Shaft support blocks
Request a Quote
- 12-month warranty (new) · 3-month (used/refurbished)
- 30-day returns, no restocking fee on unused parts
- Ships via
- 100% positive eBay feedback
What is the Bosch Rexroth R105502500?
Shaft support block (steel)
Shaft diameter d = 25
Material: Spheroidal graphite cast iron and steel
Side clamping
For easy installing and quick aligning
Precise design with reference edge
More affordable than in-house designs
Specifications
Specifications
| Accessories for linear bushings | Shaft support blocks |
| Shaft diameter d [mm] | 25.0 |
| Type | Shaft support block |
| Housing material | Spheroidal graphite cast iron and steel |
| Weight [kg] | 0.39 |
| Dimension A (profiled rail systems) [mm] | 74 |
| Dimension A1 (profiled rail systems) [mm] | 38 |
| Dimension B (profiled rail systems) [mm] | 25 |
| Dimension d H8 [mm] | 25 |
| Dimension E [mm] | 60 |
| Dimension H [mm] | 35.0 |
| Dimension H1 (profiled rail systems) [mm] | 58 |
| Dimension S [mm] | 6.6 |
| Dimension SW [mm] | 4 |
| Dimension V [mm] | 9 |
| Footnote Dimension H1 | Tolerance ISO 8062-3 - DCTG 11. |
R105502500: frequently asked questions
When can R105502500 be shipped?
R105502500 is sourced on request — request a quote and we'll confirm the exact availability and shipping timeline for this specific unit.
Can I pick up R105502500 in person?
Local pickup from our Groningen, Netherlands warehouse may be possible — contact us before ordering to check availability and arrange a collection time.
Is express delivery available?
Yes — mention it when you request a quote for R105502500 and we'll include express shipping options in our reply.
My factory is down and I need this urgently — can you help?
For a critical breakdown, contact us directly at +31 (0)50-7110348 or sales@partnerplc.com — we can look into same-day courier or dedicated taxi/hotshot delivery for R105502500, subject to availability and destination.