
Bosch Rexroth R105501600
SHAFT SUPPORT BLOCK WBS-16
- MPN
- R105501600
- Category
- Shaft support blocks
Request a Quote
- 1We check stock, condition and lead time
- 2You get a written quote by email
- 3Approve it and we ship — in-stock parts within 1 business day
- 12-month warranty (new) · 3-month (used/refurbished)
- 30-day returns, no restocking fee on unused parts
- 100% positive eBay feedback
- Ships via
What is the Bosch Rexroth R105501600?
Shaft support block (steel)
Shaft diameter d = 16
Material: Spheroidal graphite cast iron and steel
Side clamping
For easy installing and quick aligning
Precise design with reference edge
More affordable than in-house designs
Specifications
Specifications
| Accessories for linear bushings | Shaft support blocks |
| Shaft diameter d [mm] | 16.0 |
| Type | Shaft support block |
| Housing material | Spheroidal graphite cast iron and steel |
| Weight [kg] | 0.13 |
| Dimension A (profiled rail systems) [mm] | 50 |
| Dimension A1 (profiled rail systems) [mm] | 26 |
| Dimension B (profiled rail systems) [mm] | 16 |
| Dimension d H8 [mm] | 16 |
| Dimension E [mm] | 40 |
| Dimension H [mm] | 25.0 |
| Dimension H1 (profiled rail systems) [mm] | 42 |
| Dimension S [mm] | 5.5 |
| Dimension SW [mm] | 3 |
| Dimension V [mm] | 6.5 |
| Footnote Dimension H1 | Tolerance ISO 8062-3 - DCTG 11. |
No matching specifications
R105501600: frequently asked questions
When can R105501600 be shipped?
R105501600 is sourced on request — request a quote and we'll confirm the exact availability and shipping timeline for this specific unit.
Can I pick up R105501600 in person?
Local pickup from our Groningen, Netherlands warehouse may be possible — contact us before ordering to check availability and arrange a collection time.
Is express delivery available?
Yes — mention it when you request a quote for R105501600 and we'll include express shipping options in our reply.
My factory is down and I need this urgently — can you help?
For a critical breakdown, contact us directly at +31 (0)50-7110348 or sales@partnerplc.com — we can look into same-day courier or dedicated taxi/hotshot delivery for R105501600, subject to availability and destination.
More Bosch Rexroth parts









