Kuka 201615

ES36 034 PNT EPS AIR

MPN
201615
Price and lead time confirmed within 1 business day
Request a Quote

A real person replies, typically within 1 business day — see our privacy policy.

  • 12-month warranty (new) · 3-month (used/refurbished)
  • 30-day returns, no restocking fee on unused parts
  • Ships via

What is the Kuka 201615?

The dress package of the energy supply system contains the hoses and cables for fluids and signals and the flexible tube. In the case of an “energy supply system without supply lines”, an empty flexible tube with fastening materials is supplied.

Specifications

Specifications

Weight38.485 kg
HS code84799070
Country of originDE

201615: frequently asked questions

When can 201615 be shipped?

201615 is sourced on request — request a quote and we'll confirm the exact availability and shipping timeline for this specific unit.

Can I pick up 201615 in person?

Local pickup from our Groningen, Netherlands warehouse may be possible — contact us before ordering to check availability and arrange a collection time.

Is express delivery available?

Yes — mention it when you request a quote for 201615 and we'll include express shipping options in our reply.

My factory is down and I need this urgently — can you help?

For a critical breakdown, contact us directly at +31 (0)50-7110348 or sales@partnerplc.com — we can look into same-day courier or dedicated taxi/hotshot delivery for 201615, subject to availability and destination.

More Kuka parts

Kuka 201589 – ESDP 055 DN70 A1-3
Kuka
201589

ESDP 055 DN70 A1-3

Kuka 201604 – ES13 092 PNT EPS AIR
Kuka
201604

ES13 092 PNT EPS AIR

Kuka 201608 – ESDP 034 DN70 A3-6
Kuka
201608

ESDP 034 DN70 A3-6

Kuka 201610 – Bracket
Kuka
201610

Bracket

Kuka 201617 – ESF 007S PNT 2x2xAWG22
Kuka
201617

ESF 007S PNT 2x2xAWG22

Kuka 201618 – Control cable 23x1(2x1)mm²(M, measuring)
Kuka
201618

Control cable 23x1(2x1)mm²(M, measuring)

Kuka 201622 – ES13 022 (SC) CTR CCX MOT PNT EPS MEA
Kuka
201622

ES13 022 (SC) CTR CCX MOT PNT EPS MEA

Kuka 201623 – ES13 055 (SC) CTR CCX MOT PNT EPS MEA
Kuka
201623

ES13 055 (SC) CTR CCX MOT PNT EPS MEA

Kuka 201615Price and lead time confirmed within 1 business day
Request a Quote